10 ton European overhead crane

10 ton Overhead Crane

10 ton overhead crane can be designed to single beam overhead crane or double beam overhead crane as needed. It is widely applied for material lifting and transporting operations in different work occasions, such as manufacturing and processing workshop, warehouses, material yards, docks, assembly, overhaul and maintenance factory, machinery plant and metallurgy plant. Used for different occasions and requirements, the overhead cranes can be with different configurations.

Ellsen 10 ton Overhead Crane

The lifting capacity of single girder crane is usually from 0.5 ton to 20 ton, and that of double girder crane can be up to 500 ton, so 10 ton bridge crane can be produced with single or double girder as clients require. For the overhead crane, top running and under slung ways can be chosen. The lifting capacity of free standing crane, portable crane and mobile crane is usually small, so 10 ton overhead crane generally doesn’t adopt those configurations. Ellsen also supplies European overhead cranes as options for different customers, and they can work high efficiently.

10 ton overhead crane for sale
LD 10 ton Single Girder Overhead Crane

LD 10 ton overhead crane parameters:

  • Lifting Capacity: 0.5t~20t
  • Span Length: 7.5~31.5m
  • Working Class: A3~A4
  • Working Temperature: -20~40℃

Get a Free Quote

10 ton European overhead crane
HD 10 ton European Overhead Crane

HD 10 ton single girder crane parameters:

  • Lifting Capacity: 3~16t
  • Span Length: 7.5~28.5m
  • Lifting Height: 6~18m
  • Lifting Speed: 0.66/4~1.6/10m/min
  • Crane Travelling Speed: 2~20m/min
  • Working Class: A5

Get a Free Quote

Ellsen 10 ton double girder overhead crane for sale
Ellsen 10 ton LH Double Girder Overhead Crane

LH 10 ton overhead crane parameters:

  • Lifting Capacity: 5~32t
  • Span Length: 10.5~31.5m
  • Lifting Height: 6~18m
  • Lifting Speed: 3~8m/min
  • Crane Travelling Speed: 20m/min
  • Working Class: A4

Get a Free Quote

10 ton double girder EOT crane
10 ton EOT Crane for Sale

10 ton double girder EOT crane parameters:

  • Lifting Capacity: 5~320t
  • Span Length: 10.5~31.5m
  • Lifting Speed: 6~18m
  • Lifting Speed: 0.2/2~1.07/10.7m/min
  • Crane Travelling Speed: 40~68m/min
  • Working Class: A5

Get a Free Quote

10 ton European double girder overhead crane
NLH 10 ton European Overhead Crane

NLH 10 ton double girder crane parameters:

  • Lifting Capacity: 3.2~80t
  • Span Length: 10.5~31.5m
  • Lifting Height: 6~18m
  • Lifting Speed: 0.5/3.4~0.8/5m/min
  • Crane Travelling Speed: 3~30m/min
  • Working Class: A5

Get a Free Quote

Features and Advantages of European Style Overhead Crane

  1. European style overhead crane is designed and produced strictly complying with international standards, it has compact and smart structure with light dead weight;
  2. The crane has excellent working performance, and all its parts and components are with high quality and work high efficiently;
  3. It has longer service life because of its reliable production with advanced technology;
  4. With its low clearance design, it is energy-saving and environmentally friendly, which can make best use of the factory space for material handling work;
  5. The European overhead crane can improve material lifting and transporting efficiency at least 20%, and then improve economic efficiency;
  6. The crane is equipped with European electric hoist as its lifting mechanism, which is more advanced than ordinary hoist;
  7. The crane is produced with high manufacturing precision and leading technology;
  8. The crane is equipped with frequency control, its start and brake is stable, anti-swing technology can be equipped as needed to make the lifting safer and more reliable;
  9. With the European design, the crane has nice appearance and has strong corrosion resistance;
  10. The crane can make the lifting and transporting operations quicker, safer, and more stable.

No matter what type of overhead crane you choose to facilitate your work, it should be installed and operated by the persons who have been trained and know the cranes well. If  the crane is operated by someone who is not qualified, risks or accidents may happen because of improper or wrong operations. Furthermore, when you buy a new crane, you should take time to read the manual and operating instructions of the crane. To make your heavy materials lifting work easier and improve work efficiency, please just get high-quality overhead travelling cranes.

10 ton Overhead Cranes for Sale

If you have higher requirement on material handling work and demands more on overhead crane 10 ton, European type overhead crane is recommended to meet your higher demands. As a leading overhead crane manufacturer, Ellsen supplies a great many kinds of overhead cranes. Our 10 ton overhead crane price is very reasonable and competitive, and the quality of the winch is high. If you are interested in knowing more about our 10 ton overhead crane for sale, please just feel free to contact us, and we will provide you with detailed information about our 10 ton overhead crane specification for your reference when you choose the crane. Choose and trust us, and we will supply you with satisfactory overhead crane solutions.

Important Things about Overhead Crane Maintenance

With the frequent and reasonable maintenance, the crane can work safely and reliably and its parts can perform well for a long time without failure. The maintenance should be carried out daily and regularly as needed. It is necessary to pay attention to the following tips before, during and after the  maintenance work:

  1. It is important to wear labor protection supplies, while working at heights, it is necessary to fasten seat-belt; while working outside, it is necessary to wear helmet.
  2. The overhead crane should stop in the position without interfering the operation of other cranes. For the limitation, if the cranes can not stop at the safe and fixed position, the reliable protection measures are essential at the time.
  3. The hoist or trolley should stop at one end of the crane, the hook is lifted up to the limit position, and all the controller handles should be set in zero position.
  4. Before the inspection and maintenance, the power supply of the crane should be cut off and it is not allowed to close the switch without permission.
  5. During the maintenance process, the necessary parts and tools should be put in the place without sliding and falling off.
  6. Safe voltage should be used for maintenance work. The parts should be cleaned with diesel oil; if using gasoline, fire-proof measures should be taken.
  7. After finishing the maintenance, it’s required to lubricate the crane, and testing the crane cannot be carried out without putting the parts and tools in order.

Please feel free to send inquiry or email to us.
(Fields marked by an asterisk (*) are required fields.)